Read on! There are lots of posts... The right side of this blog includes static information about our mission. The left side includes daily or nearly daily posts with the newest on top. Be sure to read all of them by selecting "older posts" which is found after the last one on each "page". You can also select additional posts from the archive on the bottom right.

Thursday, July 31, 2014

The wells we financed...

A busy week indeed - we had three boreholes/wells to dedicate.  Akwasadiekrom and Nyamebkyre received wells with hand pumps as depicted here during the dedication ceremony.  The third village was large and had electricity.  They partnered with us to build an electrically powered well and tower holding tank.

Rachel and Sue pumping the first water after the ribbon cutting in Akwasadiekrom.  The previous water source was spring water bubbling up to the surface forming a small pool about 3/4 mile from the village.  All manner of things would wash down into this pool during any rain.  Still, it was the only water source.

Ribbon cutting at the blessing of the well at Nyamebekyre.
 
The team and the Methodist church administration at the dedication of the electricaly powered well at Ekumfi Otuam.  The large black tank behind the group serves as a water tower if power is off.


The Bishop tasting the first water from the faucets of the new construction.

No comments:

Post a Comment